- Energy Saving Equipment[6]
- Wood Pellets[6]
- Electricity Generation[6]
- Biogas[1]
- Boilers[1]
- Energy Saving Equipment Parts[2]
- Oil Pressers[1]
- Waste Management[1]
- Other Woodworking Machinery[3]
- Other Construction Material Making Machinery[6]
- Other Metal Processing Machinery[3]
- Metal Forging Machinery[2]
- Metal Crafts[1]
- Other Home Furniture[1]
- Contact Person : Mr. su steven
- Company Name : Shangqiu Haiqi Machinery Equipment Co., Ltd.
- Tel : 86-370-2215838
- Fax : 86-370-2311466
- Address : Henan,shangqiu,No388 Kaixuan north shangqiu city,henan province
- Country/Region : China
- Zip : 476000
Related Product Searches:biomass gasifier system and gas supply system,High Quality,gas metering station, Biomass Gasification station,HQ-1200m³/h
The company gasifies the raw materials such as rice hull, fruit hull, saw dust, palm hull, wheat straw, cotton straw, corn straw
vedio of the power plant
http://v.youku.com/v_show/id_XMzIxNTY2NDg4.html
Introduction to biomass internal-combustion power generation systemModels & specifications:400KW,800KW,1MW,1.5MW,2MW,etcApplicable raw matrrials:All the plants and organic wastes The grain size of raw materials is less than 30mm in general. The water content of the raw materials is lower than 16% in general.Nature of fuel gas:scope of calorific #118alue 6000 kilojoule/m3(standard) Tar content 50mg./m3(standard) Compositions N2 50-60% Co2 10-20% CO 10-18% H2 3-9% Ch 2-6% CnHm 0.5-3% Other 0.5-3%Operation data: Auxiliary fuel:Not necessary Start time:About 45 minutes for cold start About 15 miutes for hot start Operator:According to the project scale:1-2 persons for each shift Raw material consumption:1.0-2.0kg raw materials for generation of each kilowatt-hour Power generation cost:Will be influenced by many factors. In most regions of china,the cost for generation of each kilowatt-hour is about RMB0.2 yaun.Environment protection standara: Exhaust gas:The tail gas of gas engine shall reach the local industrial standard after treatment Waste water:The cooling water shall be trated internally for recycled use,and no waste water will be dis-charged. Waste residue:The solid wastes sahll be treated or reused through harmlessness treatment .No waste residue will be discharged. Noise:The region with noise>75 db will be reused to decrease noise influence. Smell:The space with smell will be sealed off with negative pressure,and the smell will not outflow
biomass gasifier system and gas supply system